"No one's going from 13,000 trips a day to 44,000 trips a day quickly," College Township Manager Adam Brumbaugh told council last December, according to StateCollege.com. He was answering a projection that has stayed with this corridor ever since. At full build-out, daily trips on Shiloh Road could rise from about 13,250 to an estimated 44,074. Getting there could take a decade or more.
If you're comparing parts of the State College area and east College Township is on your list, that projection is the number most people take away. The number that matters more for a buyer is smaller. The largest residential project on the corridor plans 629 homes, and 64 of them are for sale.
629 homes, 64 of them for sale
Burkentine Builders' Crew814 sits on the 48-acre Rogers property on the west side of Shiloh Road, north of Trout Road, behind the Pleasant Pointe apartments. College Township Council approved the final plan for phase one in December 2025. That phase has 197 units: 64 fee-simple townhomes, 55 rental townhomes, and two three-story apartment buildings with 42 and 36 units. Phase two adds three apartment buildings totaling 432 units, along with a 6.4-acre commercial lot. Burkentine expects to submit phase-two plans in 2028 and build that phase in several stages over a period of years.
That makes about one home in ten at Crew814 something you could buy. The other nine in ten are rentals. For a buyer, the project will change the area's traffic, the number of neighbors and eventually its retail long before it adds many new choices to the for-sale market. When the 2024 tentative plan came in, StateCollege.com reported a full build-out forecast of 2036, depending on market conditions.
The for-sale townhomes are also still some distance off. In the University Area Joint Authority's October 21, 2026 meeting packet, Crew814 Phase 1 is listed under mainline construction as "waiting on pre-construction meeting." Shiloh Commercial Park Phase 2 has the same status. When phase one was approved, the target for its completion was fall 2028. If you're buying this winter or next spring, the homes you can tour and move into on that schedule are the resale homes already standing around the site.
The road arrives before the neighbors
The roadwork is moving faster than the housing. On October 30, PennDOT Secretary Mike Carroll held a press conference on the Maxwell property, where he and local officials highlighted more than $3.6 million in state funding for Shiloh Road in College and Benner townships. That breaks down to $2.7 million in Transportation Infrastructure Investment Funds and about $925,000 from PennDOT's Multimodal Transportation Fund. StateCollege.com reported that the whole project was previously estimated at $5.85 million, with private developers contributing part of it.
The plan adds traffic signals at Shiloh Road's intersections with Trout Road, Spring Valley Road and a future access road into Crew814, along with new and longer turn lanes. PennDOT project manager Trenton Stouffer said the first phase is already underway near Shiloh and East Trout roads and is expected to run into spring 2027. The second phase is expected to start in summer 2027.
If you're touring homes near Trout Road over the next year, expect active construction on the main road out. Left turns from Trout Road onto Shiloh Road at peak hours have come up at College Township Council, and the new signal at that intersection is part of the funded work. Buyers who look at homes off that intersection during construction will be living there once it's finished.
There's a reason the roadwork is getting ahead of the buildings. Four developers, College and Benner townships, and PennDOT agreed to plan and pay for the corridor's road improvements as one package. They didn't leave each intersection to whichever project needed it first. LeRoy Kline of Delta Development, who helped coordinate the partnership, told the October 30 gathering that it took two townships, three public funding applications and 28 drafts of the private agreement. "There were a couple of times where it almost fell apart," Kline said, as StateCollege.com reported. The December 2025 financing plan used developer contributions, grants and PennDOT money, and no money from either township.
College Township Council member Eric Bernier, who also chairs the Centre County Metropolitan Planning Organization, has a long view of this road. He recalled that about 30 years ago, when the nearby Walmart was being built, the township required improvements to Trout Road, which was gravel at the time. According to StateCollege.com's account, Walmart's headquarters called it "the million-dollar road to nowhere." Trout Road is now one of the intersections getting a signal.
Two of the four tracts are still open questions
The 44,074-trip projection covers four large tracts totaling roughly 220 to 224 acres. Two have approved first phases, and plans for the other two are less clear.
The two with known plans face each other across Shiloh Road. Crew814 is on the west side. On the east side, Shiloh Commercial Park on the Maxwell property has a 115-room Home2 Suites by Hilton, which StateCollege.com described as under construction at the end of October. A Park Home Furniture store is in planning, and the commercial park has eight lots in total.
Further north on the west side, Ferris Land Development paid $7.88 million for a 44-acre tract in Benner Township in 2025. Legislation is pending to sell the developer an adjacent 9-acre state parcel that is landlocked and unused. In 2023, Ron Ferris floated two car dealerships and other commercial uses for the property, possibly including a big-box store, and last December Benner Township said it was aware of a development proposal. That same corridor presentation said this tract would generate the most new vehicle trips of any of the four. The fourth tract is the 120-acre Clair family property at the northeast end of Shiloh Road, and no plans for it have been announced.
The ideas made public so far for the corridor's biggest acreage are mostly commercial or undecided. The one residential plan is mostly rentals. On current plans, east College Township is gaining jobs, rooms, stores and apartments at a much faster rate than it's gaining homes for sale. Kline estimated that the developments together could create more than 400 jobs.
What's already there, and why it decides your search
Since new for-sale supply is limited and years away, buying near Shiloh Road means buying in the established neighborhoods and choosing among their resale homes. The open space around them is already in place and protected. Thompson Woods Preserve is a 43.36-acre property at 928 Walnut Spring Lane, protected under a conservation easement held by ClearWater Conservancy. Millbrook Marsh Nature Center has 62 acres with a boardwalk, a pollinator garden and wildlife observation decks, and admission is free. Spring Creek Park sits between the Spring View neighborhood to the north and Clover Highlands to the south, according to the township's park master plan. Across the line in Benner Township, ClearWater's Spring Creek Canyon/Rockview property covers 1,773 acres.
Errands already happen here too. The Walmart Supercenter at 373 Benner Pike is open 6 a.m. to 11 p.m. daily, with a pharmacy and grocery. Jersey Mike's at 454 Shiloh Road has been a landmark on the corridor for years. When Crew814 was first proposed, plans called for a CATA stop near its community center.
The resale homes around Shiloh Road compete in a county market that has climbed. The Centre County median sale price for October 2026, across all home types, was $382,200, against a five-year October average of $321,300, according to Centre County Association of REALTORS® market data. New construction elsewhere in the region costs well above that. One single-family community now selling off West College Avenue and Whitehall Road in Ferguson Township lists homes starting in the high $500s. In the meantime, a buyer who wants to be near Shiloh Road is choosing among existing homes at today's resale prices, while the road and the area's commercial base change around them.
For that buyer, the Shiloh Road timeline lines up with the steps of a purchase. A home you close on this winter will have roadwork near Trout Road into spring 2027 and a second phase starting that summer. Phase-two plans for Crew814's apartments aren't expected until 2028, and the full build-out forecast runs to 2036. A home's distance from the new signals at Trout Road, Spring Valley Road and the Crew814 access road is something you can check on a map before you write an offer. How busy Shiloh Road will be ten years from now depends on plans that haven't been filed yet. For how zoning splits prices on the other side of town, see our piece on State College's near-campus blocks, and our State College neighborhood page covers the wider area.
A few direct questions
Will Crew814 add many homes I could buy? Not many, and not soon. Of the 629 planned units, 64 are fee-simple townhomes, and the rest are rental townhomes and apartments. Phase one's completion target was fall 2028.
When will the Shiloh Road construction wrap up? PennDOT expects the first phase to run into spring 2027 and the second phase to begin in summer 2027. Secretary Carroll said PennDOT will keep watching traffic volumes and may need more improvements as the area grows.
Will traffic triple right away? No. The 44,074 daily-trip figure assumes all four tracts are fully built out, which township officials have said could take a decade or longer.
If you're weighing a home near Shiloh Road or Trout Road, I'm glad to pull the resale comps for those streets with you and map each one against the new signals and the Crew814 timeline before you tour. That's the kind of corridor-level homework I bring to buyers at Theresa Layton | Yocum Real Estate Centre. Let's Connect.